Preparation of SWM DPR.

Project Details:

AIILSG undertaking the various Solid Waste Management related activities. Solid waste management DPR of Municipal Solid Waste Management comprises of primary and secondary collection of waste, segregation, transportation in closed vehicles, material recovery, waste processing and final disposal in a scientifically designed Landfill.

Details of Region Project is Implemented–
The Projects in implemented in Dahod, Amrelia, Chaya, Babra, Jafrabad, Kutiyana, Lathi, Maliya, Mansa, Pardi, Probandar, Rajula, Ranavav, Valsad, Viramgam, Wankaner Municipal councils of Gujarat.

Description of Project-
The Scope of DPR includes following activities :-

  • To effectively manage huge quantity of municipal solid waste generated by the masses
  • Holistic approach to all waste streams thus maximizing synergetic benefits in collection, recycling, treatment & disposal
  • To suggest suitable technology, method and equipment for managing municipal solid waste.
  • To ensure safe disposal of waste and treat the waste as per Municipal Waste Management and Handling Rules 2000.
  • To provide quality urban environment by the way of efficient solid waste management
  • Reduce Air pollution due to bad odor of the waste.
  • To promote public and private partnership and involvement of local
  • stakeholders to successfully implement the management plan

Description of Service Provided
  • Preparing for Solid Waste Management Plan
  • Data Collection and Analysis for accurate quantification and characterization of waste
  • Waste quantification assessment and prediction. Analyze the existing waste management situation. Assessing the institutional framework and resources available
  • Stakeholders consultation comments and input. Understanding the role of different stakeholders at different levels of solid waste management chain.
  • Formulate action plan and SWM plan
  • Selection of system, equipment, vehicles, technology
  • Design waste management hierarchy, planning and design of systems, technology selection.
  • Preparation of plan for transportation of solid waste.
  • Preparation of plan for disposal on land i.e. environmentally safe and sustainable disposal in landfills.
  • Implement the action plan and monitor the results.
  • All necessary works related to the job of preparation of SWM plan